NOA Verification of Request
Automated plant optimization using feedback from cloud and edge
DOI:
https://doi.org/10.17560/atp.v64i1-2.2592Keywords:
NOA, VOR, AnlagenoptimierungAbstract
The goal of Verification on Request, a component of NAMUR Open Architecture, is to allow optimization originating from outside the plant to be processed with a high degree of automation, repeatably, safely & securely, under the full control of the plant owner, while at the same time maintaining traceability of every change affecting the plant. To this end, the NAMUR recommendation NE178, which is currently in the process of being specified, describes a domain transition model and assigns specific, discrete processing steps for request contents. It also addresses aspects of security by design and guidelines for the operation of VoR solutions. This article highlights design decisions, preliminary architectural considerations as well as functional aspects of how the NE178, as presented at the NAMUR annual general meeting 2021, envisions a VoR System-of-Systems.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Vulkan-Verlag GmbHDie Zeitschrift und alle in ihr enthaltenen Beiträge und Abbildungen sind urheberrechtlich geschützt. Jede Verwertung außerhalb der engen Grenzen des Urheberrechtsgesetzes ist ohne Zustimmung des Verlages unzulässig und strafbar. Das gilt insbesondere für Vervielfältigungen, Übersetzungen, Mikroverfilmungen und die Einspeicherung und Bearbeitung in elektronischen Systemen. Auch die Rechte der Wiedergabe durch Vortrag, Funk- und Fernsehsendung, im Magnettonverfahren oder ähnlichem Wege bleiben vorbehalten.