Seamless introduction of virtual commissioning
Best-practice workflow
DOI:
https://doi.org/10.17560/atp.v59i07-08.1888Keywords:
virtual commissioning, engineering workflow, BPMNAbstract
In 2013, the technical division „Measurement and Automatic Control“ of the Association of German Engineers founded a new technical committee working in the field of Virtual Commissioning. In 2016, the first results have been published in the new guideline VDI/VDE 3693 [1] providing definitions for possible test configurations, test methods and simulation models for the simulation-based validation of control code for automation systems. The forthcoming second part of the guideline presents a workflow for integrating Virtual Commissioning in industrial automation projects. It describes the related activities, documents and roles of the involved parties. Additionally, an outlook on future work of the technical committee will be given.
References
VDI/VDE 3693 Blatt 1:2016-08: Virtuelle Inbetriebnahme – Modellarten und Glossar. 2016. VDI: www.beuth.de
Oppelt, M., Wolf, G., Barth, M., & Urbas, L. (2015). Simulation im Lebenszyklus einer Prozessanlage. Atp Edition, 57(09), 46-59. doi:10.17560/atp.v57i09.526
ISO/IEC 19510:2013-07: Information technology -- Object Management Group Business Process Model and Notation. 2013. ISO: www.beuth.de
Downloads
Published
Issue
Section
License
Die Zeitschrift und alle in ihr enthaltenen Beiträge und Abbildungen sind urheberrechtlich geschützt. Jede Verwertung außerhalb der engen Grenzen des Urheberrechtsgesetzes ist ohne Zustimmung des Verlages unzulässig und strafbar. Das gilt insbesondere für Vervielfältigungen, Übersetzungen, Mikroverfilmungen und die Einspeicherung und Bearbeitung in elektronischen Systemen. Auch die Rechte der Wiedergabe durch Vortrag, Funk- und Fernsehsendung, im Magnettonverfahren oder ähnlichem Wege bleiben vorbehalten.