Engineering and commissioning of production plants
An analysis of the process steps involved and the resulting data flow
DOI:
https://doi.org/10.17560/atp.v65i8.2683Abstract
To meet the increased demands for individuality, flexibility and efficiency in production, plant manufacturers (not only from the automotive sector) must radically simplify their engineering and commissioning process. Effective and consistent digitization of data exchange over the entire life cycle of a plant enables optimal collaboration between the players involved and is therefore a major optimization factor. The DIAMOND project aims to create a common, interlinked/connected, cross-domain data model that can be used in industry meeting the present requirements. For this, all involved process steps, actors, tools, data formats and exchanged information must be analysed in detail. The results of this analysis are presented in this paper.
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Vulkan-Verlag GmbHDie Zeitschrift und alle in ihr enthaltenen Beiträge und Abbildungen sind urheberrechtlich geschützt. Jede Verwertung außerhalb der engen Grenzen des Urheberrechtsgesetzes ist ohne Zustimmung des Verlages unzulässig und strafbar. Das gilt insbesondere für Vervielfältigungen, Übersetzungen, Mikroverfilmungen und die Einspeicherung und Bearbeitung in elektronischen Systemen. Auch die Rechte der Wiedergabe durch Vortrag, Funk- und Fernsehsendung, im Magnettonverfahren oder ähnlichem Wege bleiben vorbehalten.